| S/N |
Name Of Project |
Type of Work |
| 1 |
Myanmar National Telecon Infra Co; Ltd, preliminary survey and inspection for 13-Nos of Telecon Towers in Bago Region and Ayerwaddy Regions |
Inspection and Report |
| 2 |
Kantharyar 2+25 Storeyed Hotel, 2+25 Storeyed Residential and 2+26 Storeyed Office Tower Project, Project Cost Verification |
Quanty Surveyer as Third Party |
| 3 |
QN Dynamic Energy Co; Ltd, Technical Consultant for Solar Energy Farm, Magway Region |
Technical
Consultant |
| 4 |
Danyingone Fruit Market Construction Project, Project Cost Verification |
Quanty Surveyer as Third Party |
| 5 |
Institute of Medicine (1) National Skills Training, Simulation and Research Center (8)Storeyed Building Construction Project |
Project Consultant
and Supervison |
| 6 |
Shwepyithar Industrial Zone(2), 33/11 KV, 20 MVA Transformer and Sub-station Installation |
Quality Control |
| 7 |
Bandoola Housing Project Dagon Myothit Township (South),
(15)Nos of 6-Units 4 Storiey Structure Buildings Construction |
Safety Inspection |
| 8 |
Thingangyun Township Thuwunna Foot Stadium durability and safety check |
Safety Inspection |
| 9 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21Storeyed Office Tower Construction Project, Environmental and Social Impact Assennment (ESIA) |
ESIA Report |
| 10 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21 Storeyed Office Tower Construction Project, Licensed Contractor Services |
Consultancy Service |
| 11 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21 Storeyed Office Tower Construction Project, Basement Construction Design Consultancy Service |
Consultancy Service |
| 12 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21 Storeyed Office Tower Construction Project, Structure Design Consultancy Services |
Consultancy Service |
| 13 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21 Storeyed Office Tower Construction Project, Water Supply and Sanitation Design Consultancy Services |
Consultancy Service |
| 14 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21 Storeyed Office Tower Construction Project, Electrical Design Consultancy Services |
Consultancy Service |
| 15 |
Kajima Yankin PPP Project, 3+22 Storeyed Hotel, 3+29 Storeyed Long Stay Hotel, 3+21 Storeyed Office Tower Construction Project, Aircond and Mechanical Ventilation Design Consultancy Services |
Consultancy Service |
| 16 |
Myanmar Medical Association, (5)Storeyed Training Center Construction |
Quality Control |
| 17 |
Housing for Government Staff Project, (8)Units (5)Storeyed
Building No.(2) Construction |
Quality Control |
| 18 |
Housing for Government Staff Project, (8)Units (5)Storeyed
Building No.(4) Construction |
Quality Control |
| 19 |
Housing for Government Staff Project, (8)Units (5)Storeyed Building No.(5) and (7) Construction |
Quality Control |
| 20 |
Lanthit Housing Project, Sheet Pile Work Supervision |
Supervision |
| 21 |
Lanthit Housing Project, Sheet Pile Work Quality Control |
Quality Control |
| 22 |
Department of Medical Research (Pyinoolwin), Staff Housing Renovation and Road Construction |
Quality Control |
| 23 |
Institute of Medicine (1) National Skills Training, Simulation and Research Center, (8)Storeyed Building Construction Project |
Quality Control |
| 24 |
Institute of Medicine (1), (6)Units (6)Storeyed Housig for Teachers construction |
Quality Control |
| 25 |
National University of Arts and Culture (Yangon), Construction of RCC (3)Storeyed Building Teaching Center |
Quality Control |
| 26 |
National University of Arts and Culture (Yangon), Constructioin of (6) Units, (4)Storeyed RCC Teachers Housing |
Quality Control |
| 27 |
Department of Higher Education, Hlaing University Campus, Sport Stadium Renovation |
Quality Control |
| 28 |
Department of Higher Education, Hlaing University Campus, Sport Stadium Renovation (Extra) |
Quality Control |
| 29 |
GTI(Insein), (4)Storeyed Teaching Center RCC Building Construction |
Quality Control |
| 30 |
GTI(Insein), (4)Storeyed Teaching Center RCC Building Construction (Extra) |
Quality Control |
| 31 |
Yangon Institute of Economics, (3)Storeyed Teaching Center Renovation |
Quality Control |
| 32 |
Yangon University, Hlaing Campus, Construction of Steel Structure Trestle 60 ft height |
Quality Control |
| 33 |
Yangon University, Hlaing Campus, Construction of Septic tanks and manholes |
Quality Control |
| 34 |
Yangon University, Hlaing Campus, Construction of Septic tanks and manholes (Extra) |
Quality Control |
| 35 |
Yangon University, Hlaing Campus, tube wells drilling and piping works |
Quality Control |
| 36 |
Yangon University, renovation of steel tresstles and concrete trestle |
Quality Control |
| 37 |
University of Foreign Language, construction of (4)Storeyed Hostel for (150)Nos of Students |
Quality Control |
| 38 |
University of Foreign Language, construction of (4)Storeyed Hostel for (150)Nos of Students (Extra) |
Quality Control |
| 39 |
Techniological University (Thanlyin), (4)Units (4)Storeyed RCC Teachers Housing Costruction |
Quality Control |
| 40 |
Techniological University (Thanlyin), (4)Units (4)Storeyed RCC Teachers Housing Costruction (Extra) |
Quality Control |
| 41 |
Technological University (Thanlyin), (2)Storeyed Hostel for (160)Nos of Students Construction |
Quality Control |
| 42 |
Technological University (Thanlyin), (2)Storeyed Hostel for (160)Nos of Students Construction (Extra) |
Quality Control |
| 43 |
Technological University (Thanlyin), (4)Units (4)Storeyed RCC Teachers Housing Costruction |
Quality Control |
| 44 |
Technological University (Thanlyin), (4)Units (4)Storeyed RCC Teachers Housing Costruction (Extra) |
Quality Control |
| 45 |
Yankin Educational College, (3)Storeyed RCC Teaching Center Construction |
Quality Control |
| 46 |
Yankin Educational College, RCC (4)Units (4)Storeyed RCC Teachers Housing Costruction |
Quality Control |
| 47 |
Aung Myint Mo Low-cost Housing Project, Dagon Myothit (South), Installation of 11/0.4 KV, 200 KVA Transformer (23)Nos and Power Line |
Quality Control |
| 48 |
Fire Service Station, Dagon Myothit (South), (6)Units (3)Storeyed Staff Housing Construction |
Quality Control |
| 49 |
Fire Service Station, Laydauntkan, (2)Storeyed Building |
Quality Control |
| 50 |
Fire Service Station, Dagon Myothit (North), (4)Units (3)Storeyed Staff Housing Construction |
Quality Control |
| 51 |
Fire Service Station, Dagon Myothit (North), (5)Storeyed Building complete with electricity and water supply |
Quality Control |
| 52 |
Fire Service Station, Dagon Myothit (South), (4)Units (2)Storeyed Staff Housing Construction |
Quality Control |
| 53 |
Fire Service Station, Mayangone, (4)Units (4)Storeyed |
Quality Control |
| |
Staff Housing Construction |
|
| 54 |
Fire Service Station, Yankin Township, (6)Storeyed Building |
Quality Control |
| |
Construction with road, bridge, electricity and water supply |
|
| 55 |
Department of Planning, Mingalardon Township, Concrete |
Quality Control |
| |
Road Costruction |
|
| 56 |
Department of Planning, Mingalardon Township, Northern |
Quality Control |
| |
District Office Heavy Renovation |
|
| 57 |
Department of Planning, Dagon Myothit (South), Planning |
Quality Control |
| |
Office Fencing Costruction |
|
| 58 |
Department of Planning, Tharketa Township, Planning Office |
Quality Control |
| |
(1)Storeyed RCC Building Construction |
|
| 59 |
Prosons Department, (6)Units (4)Storeyed Staff Housing Construction |
Quality Control |
| 60 |
Prosons Department, (6)Units (4)Storeyed Staff Housing Construction |
Quality Control |
| 61 |
Prosons Department, (6)Units (4)Storeyed Staff Housing Construction |
Quality Control |
| 62 |
Ministry of Construction, Department of Road, Kwungyangone Township, Hnyetkyitaung-Thaunggon Earth filling for Road Costruction, 2/7 mile to 6/0 mile |
Quality Control |
| 63 |
Ministry of Construction, Department of Road, Kwungyangone Township, Hnyetkyitaung-Thaunggon Concrete Pavement Construction, 2/7 mile to 6/0 mile |
Quality Control |
| 64 |
Ministry of Construction, Department of Road, Kwungyangone Township, Hnyetkyitaung-Thaunggon Stone Pavement Construction, 7/4 mile to 10/0 mile |
Quality Control |
| 65 |
Ministry of Construction, Department of Road, Kwungyangone Township, Hnyetkyitaung-Thaunggon open-shet construction, between 0/0 mile and 10/0 mile |
Quality Control |
| 66 |
Ministry of Construction, Department of Road, Kwungyangone Township, Hnyetkyitaung-Thaunggon Stone Pavement Construction, 0/0 mile to 2/7 mile |
Quality Control |
| 67 |
Yangon Region Development Committee, Khayan Township, Road Costruction 2 portions with 25 Culvert Box and Drainage |
Quality Control |
| 68 |
Yangon Region Development Committee, Kyauktan Tsp, Road Construction 35 portions with 16 Culvert Boxes, 3 Buildings and water supply and other 1 |
Quality Control |
| 69 |
Yangon Region Development Committee, Kwungyangon 2 Buildings |
Quality Control |
| 70 |
Yangon Region Development Committee, Khawhmu Township, Road Construction 15 portions with 35 Culvert Boxes, 7 Buildings, 5 Brick Drainage and others 2 |
Quality Control |
| 71 |
Yangon Region Development Committee, Khayan Township, Bridge Construction (SM Engineering & Trading Co.,Ltd) |
Quality Control |
| 72 |
Yangon Region Development Committee, Khayan Township, Road Construction 35 portions (Mingalar Yadanar Toe Co.,Ltd) |
Quality Control |
| 73 |
Yangon Region Development Committee, Khayan Township, Stone Retaioning Wall Construction 2-Portions |
Quality Control |
| 74 |
Yangon Region Development Committee, Khayan Township, Road Construction 2 portions (Comity Co.,Ltd) |
Quality Control |
| 75 |
Yangon Region Development Committee, Kwungyangon Tsp, Concrete Road Construction 4 portions with 4 Culverts, 1 Brick Drainage (Ngwe Sin San Thit Co.,Ltd) |
Quality Control |
| 76 |
Yangon Region Development Committee, Kwungyangon Tsp, Concrete Road Construction 3 portions with 3 Culverts, 1 Staff Housing, 1 Garrage and Fencing Construction (SM Engineering & Trading Co.,Ltd) |
Quality Control |
| 77 |
Yangon Region Development Committee, Kwungyangon Tsp, Concrete Road 8 portions, 6 Culvert boxes, Brick Drainage (Zwe Nyi Naung Co.,Ltd) |
Quality Control |
| 78 |
Yangon Region Development Committee, Kwungyangon Tsp, Concrete Road Construction 8 portions, 5 Culverts Boxes, 1 Brick Drainage (ATY Construction Co.,Ltd) |
Quality Control |
| 79 |
Yangon Region Development Committee, Taikkyi Township, Raod Construction 70 portions, 44 Culvert Boxes, 4 Buildings, 2 Drainage |
Quality Control |
| 80 |
Yangon Region Development Committee, Kwungyangon Tsp, Concrete Road Construction 6 portions, 1 Culverts Boxes, 1 Building, 1 Platform |
Quality Control |
| 81 |
Yangon Region Development Committee, Kyauktan Tsp, Road Construction 3 portions, 1 Overhead Water Tank, 1 Fencing |
Quality Control |
| 82 |
Yangon Region Development Committee, Khawhmu Township, Road Construction 3 portions, 1 Culvert Box |
Quality Control |
| 83 |
Yangon Region Development Committee, Khayan Township, Road Constructin 1 portion, 1 Bridge, 1 clvert box, 1 drainage, 1 retaining wall, 1 tube well, 2 fencing |
Quality Control |
| 84 |
Yangon Region Development Committee, Taikkyi Township, road construction 5 portions, |
Quality Control |
| 85 |
Department of Road Transport, Yangon Northern District, entrance road vehicle inspecition office |
Quality Control |
| 86 |
Department of Road Transport, Htaukkyant, construction of steel structure RCC building |
Quality Control |
| 87 |
Department of Road Transport, Htaukkyant, installation of roller shutter for 2-storeyed steel structure building |
Quality Control |
| 88 |
Institute of Medicine (1), decoration of 3 laboratries at level 3 of (8) storeyed building, National Skills Training, Simulation and Research Center |
Quality Control |
| 89 |
Institute of Medicine (1), installation of 315 KVA Transformer for teachers’ resident in Saint John space |
Quality Control |
| 90 |
Institute of Medicine (1), major renovation of teching building at Thahton Road, Pyay Road |
Quality Control |
| 91 |
Myanma Timber Enterprise, Shwepyithar Log yard, brick fencing |
Quality Control |
| 92 |
Department of Revenue, Hlaingtharyar Tsp, Thaunggyi (North) No. (8) Quarterk 1 storeyed office building |
Quality Control |
| 93 |
Yangon University, Hlaing Campus, major renovation of teaching theatre-9 nos |
Quality Control |
| 94 |
Techonological University (Thanlyn), main teaching building |
Quality Control |
| 95 |
Department of Rural Development, Kwungyangon Township, Road Construction 2 portions |
Quality Control |
| 96 |
Department of Rural Development, Kwungyangon Township, Bridge Construction |
Quality Control |
| 97 |
Department of Rural Development, Kwungyangon Township, road construction 1 portion (Ywet Thit Nu Way Co;) |
Quality Control |
| 98 |
Department of Rural Development, Kwungyangon Township, road construction 1 portion, and 2 bridges (Dhana Dipar) |
Quality Control |
| 99 |
Department of Rural Development, Kwungyangon Township, road construction 1 portion, and 1 pipe culvert (Than Naing Ag) |
Quality Control |
| 100 |
Department of Rural Development, Kwungyangon Township, Road Construction 2 portions, 1 bridge (Golden Icon) |
Quality Control |
| 101 |
Department of Rural Development, Kwungyangon Township, 4 bridges, 1 pipe vulvert (Shwe Paw Kyun Co., Ltd.) |
Quality Control |
| 102 |
Department of Rural Development, Kwungyangon Township, road construction 1 portion, 1 bridge (Moe Yan Aung Co., Ltd.) |
Quality Control |
| 103 |
Department of Rural Development, Kwungyangon Township, road construction 1 portion, 1 box culvert (Zwe Nyi Naung Co., Ltd.) |
Quality Control |
| 104 |
Department of Rural Development, Kwungyangon Township, 3 bridges (Moe Yan Aung Co., Ltd.) |
Quality Control |
| 105 |
Department of Meteorology and Hydrology, Kwungyangon Township, Office, construction of fencing and stone pavement |
Quality Control |
| 106 |
Department of Meteorology and Hydrology, Kwungyangon Township, constrution of office building and staff housing |
Quality Control |
| 107 |
Department of Basic Education, Khawhmu Township, B.E.P.S (kwin Wine) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 108 |
Department of Basic Education, Khawhmu Township, B.E.P.S (Kwin Wine) (60’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 109 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S(5) (180’x30′) RCC 4 storeyed building construction |
Quality Control |
| 110 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S(5) (180’x30′) RCC 4 storeyed building construction (Extra) |
Quality Control |
| 111 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (15), (180’x30′) RCC 2 storeyed building constrution |
Quality Control |
| 112 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (16), (180’x30′) RCC 2 storeyed building |
Quality Control |
| 113 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (6), (140’x30′) RCC 2 storeyed building |
Quality Control |
| 114 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (17), (120’x30′) RCC 2 storeyed building |
Quality Control |
| 115 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (5), (120’x30′) RCC 2 storeyed building |
Quality Control |
| 116 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (8), (120’x30′) RCC 2 storeyed building |
Quality Control |
| 117 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S (Branch) B.E.M.S (8), (120’x30′) RCC 2 storeyed building (Extra) |
Quality Control |
| 118 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(26) (120’x30′) RCC 2 storeyed building construction |
Quality Control |
| 119 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(26) (120’x30′) RCC 2 storeyed building construction (Extra) |
Quality Control |
| 120 |
Department of Basic Education, Hlaing Tharyar Township, Principle School(45) (120’x30′) RCC 2 storeyed building construction |
Quality Control |
| 121 |
Department of Basic Education, Hlaing Tharyar Township, Principle School(45) (120’x30′) RCC 2 storeyed building (Extra) |
Quality Control |
| 122 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S(1) (180’x30′) RCC 1 storeyed building construction |
Quality Control |
| 123 |
Department of Basic Education, Hlaing Tharyar Township, B.E.H.S(1) (180’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 124 |
Department of Basic Education, Hlaing Tharyar Township, B.E.M.S(19) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 125 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(42) (130’x30′) RCC 1 storeyed building construction |
Quality Control |
| 126 |
Department of Basic Education, Hlaing Tharyar Township, (B.E.P.S(42) 130’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 127 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(8) (90’x30′) RCC 1 storeyed building construction |
Quality Control |
| 128 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(8) (90’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 129 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(7) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 130 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(33) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 131 |
Department of Basic Education, Hlaing Tharyar Township, B.E.P.S(33) (120’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 132 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(5) (120’x30′) RCC 3 storeyed building construction |
Quality Control |
| 133 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(5) (120’x30′) RCC 3 storeyed building construction (Extra) |
Quality Control |
| 134 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S(2) (120’x30′) RCC 2 storeyed building construction |
Quality Control |
| 135 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S(2) (120’x30′) RCC 2 storeyed building construction (Extra) |
Quality Control |
| 136 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S(1) (120’x30′) RCC 2 storeyed building construction |
Quality Control |
| 137 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S(1) (120’x30′) RCC 2 storeyed building construction (Extra) |
Quality Control |
| 138 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S(1) (120’x30′) Brick Nogging Roof Sheet Steel Structure, 1 storyed building construction |
Quality Control |
| 139 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S(1) (120’x30′) Brick Nogging Roof Sheet Steel Structure, 1 storyed building construction (Extra) |
Quality Control |
| 140 |
Department of Basic Education, Shwe Pyi Thar Tsp, B.E.H.S(Branch) Middle School No.(3), (150’x30′) RCC 1 storeyed building construction |
Quality Control |
| 141 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.H.S (Branch) Middle School No.(3), (150’x30′) RCC 1 storeyed building construction (Additional) |
Quality Control |
| 142 |
Department of Basic Education, Shwe Pyi Thar Township, Principle School(35) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 143 |
Department of Basic Education, Shwe Pyi Thar Township, Principle School(35) (120’x30′) RCC 1 storeyed building construction (Additional) |
Quality Control |
| 144 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(11) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 145 |
Department of Basic Education, Shwe Pyi Thar Tsp, B.E.H.S (Branch) Middle School (8), (60’x30′) RCC 1 storyed building construction |
Quality Control |
| 146 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(9) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 147 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(29) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 148 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(6) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 149 |
Department of Basic Education, Shwe Pyi Thar Township, B.EM.S(32) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 150 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(Branch)(12) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 151 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.M.S(Branch)(25) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 152 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.P.S(18) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 153 |
Department of Basic Education, Shwe Pyi Thar Township, B.E.P.S(Brandh)(19) (120’x30′) RCC 1 storeyed building construction |
Quality Control |
| 154 |
Department of Basic Education, Hmawbi Township, B.E.P.S (Kyaukkarkwin) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 155 |
Department of Basic Education, Hmawbi Township, B.E.P.S (Kwungyangone) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 156 |
Department of Basic Education, Hmawbi Township, B.E.P.S kwungyangone) (60’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 157 |
Department of Basic Education, Hmawbi Township, B.E.P.S (Moe Gyo Pyit) (60’x30′) Brick Nogging, CGI Sheet Roofing, Steel Structure, 1 storyed building construction |
Quality Control |
| 158 |
Department of Basic Education, Hmawbi Township, B.E.P.S (Moe Gyo Pyit) (60’x30′) Brick Nogging, CGI Sheet Roofing, Steel Structure, 1 storyed building construction (Extra) |
Quality Control |
| 159 |
Department of Basic Education, Hmawbi Township, B.E.P.S (Yay Kyi San) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 160 |
Department of Basic Education, Hmawbi Township, B.E.P.S (Yay Kyi San) (60’x30′) RCC 1 storeyed building construction (Extra) |
Quality Control |
| 161 |
Department of Basic Education, Hmawbi Township, B.E.P.S (War Pa Tow) (60’x30′) RCC 1 storeyed building construction |
Quality Control |
| 162 |
Department of Highways, Hlaingtharyar Township, road construction, 5 portions |
Quality Control |
| 163 |
Department of Public Health, Yangon Region, Medical Service and Midwifery School, Kwungyangon Township, staff housing Staff Housing 4 uints 4 storeyed RCC building construction |
Quality Control |
| 164 |
Department of Public Health, Yangon Region, Medical Service and Midwifery School, Khawhmu Township, 2 Streyed RC Building construction |
Quality Control |
| 165 |
Department of Public Health, Yangon Region, Medical Service and Midwifery School, Khawhmu Township, staff housing 4 uints 4 storeyed RCC building construction |
Quality Control |
| 166 |
Department of Public Health, Yangon Region, Medical Service and Midwifery School, Khawhmu Township, staff housing 4 uints 1 storeyed RCC building construction |
Quality Control |
| 167 |
Department of Public Health, Yangon Region, Medical Service and Midwifery School, North Okkalapa Township, Staff Housing, 4 uints 4 storeyed RCC building construction |
Quality Control |
| 168 |
Department of Public Health, Yangon Region, North Okkalapa Tsp, Staff Housing RCC 4 uints 4 storeyed building construction |
Quality Control |
| 169 |
Department of Labour, Immigration and Population, Yangon Region, Shwepyithar Tsp, Record Office RCC 1 building construction |
Quality Control |
| 170 |
Yangon Electricity Service Corporation (YESC) Rural Electrification (Extra) |
Quality Control |
| 171 |
Yangon Electricity Service Corporation (YESC), Kwungyangon Tsp, Latt khote Kone Village, 33/ 11 kV, 5MVA Transformer Installation (ICE Co; Ltd) |
Quality Control |
| 172 |
YCDC Landscaping & Playground, Thingankyun Tsp, drainage work and Fencing Work in Shwe Pyi Thar Township |
Quality Control |
| 173 |
YCDC, Water Supply, Construction works (39) Items |
Quality Control |
| 174 |
YCDC Water Supply, Construction works (23) Items |
Quality Control |
| 175 |
YCDC Water Supply, Construction Works (19) Items |
Quality Control |
| 176 |
YCDC Water Supply, Construction Works (5) Items |
Quality Control |
| 177 |
YCDC Water Supply, Construction Works (94) Items |
Quality Control |
| 178 |
YCDC Water Supply, Construction Works (20) Items |
Quality Control |
| 179 |
YCDC Waste Water & Drainage, Construction Works (2) Items |
Quality Control |
| 180 |
YCDC Environmental Conservation & Cleaning, Construction Works (24) Items |
|
| 181 |
YCDC Environmental Conservation & Cleaning, Construction Works (24) Items |
Quality Control |
| 182 |
YCDC Road/Birdge, Construction Works (40) Items |
Quality Control |